Skip Navigation

Number of Permits by Office


This data is current as of: Friday, January 31, 2025

Select a Permit Type to View Specific Information
Permit Type Total Under Review
IW Dewatering Operations 1
Water - Domestic Wastewater Collection/Transmission System 9
Water - Domestic Wastewater Facility Permit 1
Water - Domestic Wastewater Type I Facility Permit 1
Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit 9
Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit 5
Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit 4
Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit 11
Water - Drinking Water Distribution System General Permit 1
Water - ERP Conceptual Approval Permit 1
Water - ERP Exemption Permit 296
Water - ERP Formal Determination 14
Water - ERP Modifications 21
Water - ERP Noticed General Permit 39
Water - Individual With No Conceptual Approval Permit 231
Water - Industrial Wastewater Concrete Batch Plant Permit 4
Water - Industrial Wastewater Group 1, Non-surface Water Discharge Permit 1
Water - Industrial Wastewater Group 3, Non-surface Water Discharge Permit 1
Water - Industrial Wastewater Group 4C, Egg Production, Major Permit 1
Water - Industrial Wastewater Group 5A, Design Daily Discharge >500,000 GPD Permit 1
Water - Industrial Wastewater Group 6C, >1 Million BTU/HR Heat Loss Up to 20 Million Permit 1
Water - Industrial Wastewater Group 7C, Design Daily Flow >50,000 Up to 100,000 GPD Permit 1
Water - Industrial Wastewater Group 7D, Design Daily Flow 50,000 or Less GPD Permit 1
Water - Industrial Wastewater Group 8D, Design Daily Flow of 50,000 or Less GPD Permit 1
Water - Injection Well Construction Permit 44
Water - Injection Well Operation Permit 20
Water - Injection Well Plug and Abandonment Permit 4
Water - Mangrove Alterations Permit 13
Water - Mangrove Exemptions 2
Water - State 404 General Permit 24
Water - State 404 Individual Permit 63
Water - State 404 No Permit Required 51
Water - Underground Injection Control - Construction/Operation Permit 1
Water - WOTUS Determination with WMD Formal 5