Skip Navigation

Number of Permits by Office


This data is current as of: Thursday, April 3, 2025

Select a Permit Type to View Specific Information
Permit Type Total Under Review
Beach Management Agreement 1
Water - Domestic Wastewater Collection/Transmission System 4
Water - Domestic Wastewater Type I Facility Permit 1
Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit 7
Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit 7
Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit 5
Water - Domestic Wastewater Type III Facility Permit 1
Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit 9
Water - Drinking Water Distribution System General Permit 2
Water - ERP Conceptual Approval Permit 2
Water - ERP Exemption Permit 331
Water - ERP Formal Determination 15
Water - ERP Modifications 25
Water - ERP Noticed General Permit 58
Water - Individual With No Conceptual Approval Permit 223
Water - Industrial Wastewater Concrete Batch Plant Permit 2
Water - Industrial Wastewater Group 4A, Feedlots W/> Than Number Of Listed Animals Permit 2
Water - Industrial Wastewater Group 5A, Design Daily Discharge >500,000 GPD Permit 2
Water - Industrial Wastewater Group 6C, >1 Million BTU/HR Heat Loss Up to 20 Million Permit 1
Water - Industrial Wastewater Group 7C, Design Daily Flow >50,000 Up to 100,000 GPD Permit 2
Water - Industrial Wastewater Group 7D, Design Daily Flow 50,000 or Less GPD Permit 1
Water - Industrial Wastewater Group 8C, Design Daily Flow >50,000 to 100,000 GPD Permit 1
Water - Industrial Wastewater Group 8D, Design Daily Flow of 50,000 or Less GPD Permit 1
Water - Industrial Wastewater Group 9B, Recycling 10,000 or Less GPD Permit 1
Water - Injection Well Construction Permit 35
Water - Injection Well Operation Permit 19
Water - Injection Well Plug and Abandonment Permit 4
Water - Mangrove Alterations Permit 13
Water - State 404 General Permit 24
Water - State 404 Individual Permit 63
Water - State 404 No Permit Required 51
Water - Underground Injection Control - Abandonment Permit 1
Water - Underground Injection Control - Construction/Operation Permit 1
Water - WOTUS Determination with WMD Formal 5